Job Title: Emeryville Marina Breakwater Replacement Location: Emeryville CA Owner: City of Emeryville Vortex Role: Prime Contractor Date: June 2006 to March 2007 Project Description: This project required that a new 1280 foot concrete breakwater be constructed to protect the Emeryville
Harbor and Marina due to the severe degradation of the existing timber structure.
Contract Value: $5,350,000 |
![]() |
|
Job Title: Berths 23-26 & 30 Wharf & Embankment Strengthening Program Location: Oakland CA Owner: Port of Oakland Vortex Role: Prime Contractor Date: July 2005 to November 2006 Project Description: This project consisted of retrofitting 2820 lineal feet of existing concrete wharf to support larger container ships and increased container loads, with embankment strengthening to allow for greater dredging depth of the Berth. Additionally, the existing fender system was removed and upgraded. Mechanical systems were upgraded or replaced throughout.
Contract Value: $20,300,000 |
![]() |
|
Job Title: Rehabilitation and Construction of Piers 1.5, 3 & 5 Location: San Francisco CA Owner: San Francisco Waterfront Partners, LLC Vortex Role: Sub Contractor to SJ Amoroso Date: June 2004 to September 2006 Project Description: This project consisted of partial replacement and structural rehabilitation of the existing 90 year old Piers that serve as the foundation for several commercial waterfront buildings. In addition, a concrete portwalk was constructed as a walkway along the waterside face of the buildings looking out over San Francisco Bay.
Contract Value: $12,500,000 |
![]() |
|
Job Title: Repairs to North Cargo Piers & Asssociated Bulkheads Location: Port Canaveral FL Owner: Canaveral Port Authority Vortex Role: Prime Contractor Date: August 2004 to November 2006 Project Description: Vortex completed this large scale marine facility rehabilitation project, which included concrete replacement and galvanic protection of precast deck units, pile caps, and prestressed piles, for the Canaveral Port Authority at its North Cargo Piers 1-4.
Contract Value: $6,443,000 |
![]() |
|
Job Title: Port Fender Replacement Berths 2, 3 & 5 Location: Pensacola FL Owner: Port of Pensacola Vortex Role: Prime Contractor Date: January 2006 to June 2006 Prime Description: This project entailed the sequenced installation of 1235 feet of new driven steel pile and timber fender
system at three contiguous berths, 2, 3 and 5, within the Port of Pensacola. This project was closely coordinated with the Port to allow for minimal disruption to the vessel berthing schedule.
Contract Value: $1,720,000 |
![]() |
|
Job Title: Pier 4 Fender Replacement Concord NWS Location: Concord CA Owner: U.S. Navy Vortex Role: Sub Contractor to American Bridge Date: June 2006 Project Description: As marine subcontractor to American Bridge Company, on a task order as part of 5 year IDIQ-MACC Contract for New Construction and Maintenance of the US Navy’s West Coast Facilities, Vortex replaced the Pier 4 timber fender system at the Concord Naval Weapons Station.
Contract Value: $565,000 |
![]() |
|
Job Title: New Carquinez Bridge Location: Crockett CA Owner: California Department of Transportation Vortex Role: Sub Contractor to FCI/Cleveland Bridge JV Date: April 2000 to February 2004 Project Description: As marine subcontractor to the FCI/Cleveland Bridge JV, Vortex performed major marine foundation work and provided marine support for construction of the new 3,465 foot long, 3-span suspension bridge. The project won numerous awards and received international recognition, becoming North America’s first suspension bridge of its kind to be built in 35 years, as well as the first suspension bridge to be built in the U.S. with concrete towers.
Contract Value: $14,650,000 |
![]() |
|
Job Title: Richmond Yacht Club Marina Replacement Location: Richmond CA Owner: Richmond Yacht Club Vortex Role: Prime Contractor Date: April 2005 to December 2005 Project Description: Construction of 62,720 square foot marina complex with driven concrete prestressed piles
Contract Value: $4,876,000 |
|
|
Job Title: Walter F. George Lock, Powerhouse, & Spillway Location: Ft. Gaines GA/AL Owner: U.S. Army Corps of Egineers Vortex Role: Sub Contractor to Treviicos/Rodio JV Date: January 2002 to April 2004 Project Description: Marine and underwater construction/support of prototype cut-off wall upstream of dam face, passing through lock and sub-bottom retaining wall, and tying in to foundation of dam in over 100 feet of water
Contract Value: $9,570,000 |
![]() |